
Dose
Add a measured dose of creative energy to your space with this Fusion interior signage collection, where flowing forms create a unique presence and refined visual balance.
Fusion interior signage collection, Dose, carries a measured curvilinear energy, with flowing forms that feel deliberate and harmonious. Its presence brings an unexpected cohesion and rhythm, adding a refined, approachable vitality to the environment.
- Lead Time
Standard: 3-4 weeks
Custom: Extended lead time - Materials
PVC-free core
0.035" (nominal) standard HPL face
Min. 0.025" Grade II Braille
1/32” raised tactile lettering
.080" non-glare insert window
Decorative mounting hardware - Compliance
A117.1 - Standard
ADAAG
EPA TSCA Title VI
ANSI A208.2
California Air Resources Board
Airborne Toxic Control Measures
Fire rating 101 Life safety code
- Collections
- Insert Templates
- Warranty
Explore every finish.
Refine every detail.
Our Design Center puts the latest Fusion and Vivid designs at your fingertips. Pick a collection and then choose from 35+ private-labeled laminate finishes or a curated color palette. Done.
Dose Sign Types

Medium Room ID

Room ID with Insert

Room ID with Occupancy Slider

Restroom Sign

Stair Sign

Flag Mounted

Directory

Directional

Overhead
Dimensions + Message options
Choose from one of the following options or customize to suit your needs.

There's a Fusion Collection for every interior space.
Design Process
- [1]
Getting Started
Client provides the following, and we have a quick review call.
Design Direction: Use our design center – or share your vision through finish boards, photos, or renderings, and we’ll take it from there.
Floor plans: CAD is preferred, but PDFs work too.
Project Name and Address
Timeline information: Critical dates from the client’s timeline. - [2]
Design Development
Based on input, Takeform delivers the following in 5-7 business days:
Draft location plan: (aka: takeoff) Shows every code-required sign.
Budget
Revisions: You give feedback. We make updates.
Approval: Design, scope, and budget approved. Client commits to production doc step. - [3]
Production Docs
Finalize all documents required to implement the project:
Proofs: Every sign with actual message. First draft message schedule.
Final Location Plan : The final location of each sign is shown on the floor plans.
Finish and Print Samples: We send physical samples for approval.
Approval: Review and approve production docs and samples. Submit deposit. - [4]
Manufacturing
3-4 week standard lead time.
Schedule installation - [5]
Installation
We cover the US and Canada.
Installation is always optional.
- [6]
Ownership Services
Dedicated Client Advisor
TakeCharge
Cloud-based portal to access your location plans, renderings, proofs, and completion photos.

Your signs. Your way.
Use our Design Center to select interior sign types and experiment with finishes – all before you specify.
Related products
Related Capabilities

Sign System Design
Designing beautiful things takes a unique skill set. Sign systems require the eye of a designer plus the specialized knowledge needed to create a successful program and deep understanding of code requirements.

Wayfinding Signage Design
We plan exterior wayfinding systems that help pedestrians and drivers navigate campuses, parking areas, building entrances and destinations while reinforcing your brand throughout the journey.

Brand Implementation
Large-scale spatial branding across complex organizations requires creative vision and logistical muscle. We serve up design sensitivity, technical sensibilities, and get-it-done know-how with a partnership mindset. We leverage our prowess to implement your plan and make you shine.



